What can AMR include in the bid?
AMR can price panel replacement, device and circuit work, sprinkler monitoring integration, and communicator coordination as part of a defined commercial retrofit. If the project also needs power or cabling, include those drawings so the proposal can identify the related scope and responsibilities.
- Panel and device replacement by building, wing, or floor
- Sprinkler waterflow and valve supervisory interfaces
- Coordination of work windows, cutover responsibilities, and closeout
How do you plan work while the hotel stays open?
Start with the renovation sequence and the hotel’s operating schedule. Identify occupied floors, meeting and event dates, access restrictions, and permitted work windows. The project team can then define the sequence, verify responsibilities, and coordinate testing and turnover with hotel engineering and the applicable fire authority.
What should I send for a phased retrofit bid?
Send the hotel address, bid deadline, fire alarm drawings or specifications, existing panel and communicator models if available, floor count, and proposed renovation phases. Include brand or owner specifications, any inspection notices, and the work windows your engineering team can make available.
Send Plans for a BidCall (562) 441-5227 · mike@amrinstalls.com